词语站>英语词典>cable length翻译和用法

cable length

英 [ˈkeɪbl leŋθ]

美 [ˈkeɪbl leŋθ]

链(英国608英尺,美国720英尺);电缆长度;线长;电线长度

英英释义

noun

双语例句

  • Place the units in their intended mounting locations to check the cable length and monitor installation conditions.
    把设备放入计划好的安装位置,检查电缆长度和监视器安装条件。
  • The calculation for construction control of the bridge is made with 3D Bridge program and the unstressed cable length method is used to control the final target status of the bridge in the spacial program.
    施工控制计算采用3DBridge进行,并在空间程序上利用无应力索长法控制斜拉桥最终目标状态。
  • Determination of Control Cable Length of PC Cable-stayed Bridge
    PC斜拉桥施工控制索长的确定
  • Under the conditions of given initial mid-span deflection, the cable length increment and load increment were obtained by means of the mid-span deflection increment.
    在给定初始跨中挠度的条件下,利用跨中挠度增量值求得索长增量值与载荷增量值;
  • The iterative calculation method of unstressed cable length has been successfully applied to pre-stress steel grid shell works of Jiangning Stadium.
    该迭代算法的无应力索长的计算方法在江宁体育场预应力钢网壳工程中已成功应用。
  • According to the mechanic characteristics of this system, the bearing cable, the stress-free cable length of carry cable and the meticulous algorithm of suspension force of each span are given, and the influence of gentle cable elongation on its dead weight is presented.
    文中根据该系统的力学特点,给出了承重索、轨索的无应力索长和各跨吊杆力的精细算法,并计入了柔索伸长对其自重集度的影响。
  • Then the calculation formulas of stressed and unstressed cable length are required by the cable element length's integral method.
    最后由积分法导出了主缆索有应力和无应力长的计算公式。
  • The principle error of the TDR cable length measurement has also been analyzed. The influence of measuring numbers, counting pulse frequency and traveling wave velocity on measuring accuracy is analyzed.
    分析了时域反射电缆测长的原理误差,研究了测量次数、计数脉冲频率、行波波速对测量精度的影响。
  • In this paper, to avoid the current-contact measurement of the drawbacks, a laser Doppler Effect based on the non-contact cable length measurement is used.
    本文针对现行接触式测量所存在的弊端,采用了一种基于激光多普勒效应的非接触式电缆长度测量方法。
  • As a kind of pre-stressed structures, the most important factor of the deviation of the initial shape and initial pre-tension of cable-strut tensile structures is the member length error ( cable length error and strut length error, hereinafter referred to as "length error").
    作为一类预应力结构,构件长度误差(即索长和杆长误差,以下简称为长度误差)是造成索杆张力结构初始形态和初始预张力偏差的最主要因素。